Stirling Schools PPP

Contract Value

£650,000

Contract Period

July 2007 – May 2008

Contract Form

SBCC Minor Works Contract (2006)

Client

Stuart Milne Construction

Engineer

Dougal Thornton

Land Engineering was appointed as a specialist sub-contractor to design and construct the pitches at the new Wallace High School in Stirling. This comprised of one third-generation full-size football pitch and two full-size grass pitches.

Activities

  • Ground remediation.
  • Drainage.
  • Full-size synthetic pitch.
  • Two natural grass pitches.
  • Sports equipment installation.
  • Floodlighting.
  • Perimeter fencing.

Outcome

Our work was completed successfully and as budgeted for in time and cost.

Download Case Study

Click the link below to download the pdf