Edinburgh Schools PPP
|
Contract Value
|
£2,256,000
|
|
Contract Period
|
April 2002 – April 2004
|
|
Contract Form
|
Ammended JCT 98 Form of Contract
|
|
Client
|
The City of Edinburgh Council
|
|
Engineer
|
Professional Sportsturf Designers
|
|
Architect
|
Amey-Miller
Miller Construction
Tulloch Construction
Ogilvie Construction
Lilley Construction
|
Land Engineering was appointed as a specialist sub-contractor to design and construct natural and synthetic sports pitches for various schools within the Edinburgh area, as part of the Edinburgh Schools PPP programme.
Activities
-
The works involved the design and construction of one full-size and seven seven-a-side synthetic pitches, including perimeter fencing and floodlighting.
- The project also involved the design and construction of new full-size grass pitches, along with refurbishment of existing grass sportsfield facilities.
Outcome
As in many cases where new facilities are sited at the locale of demolished schools, the programme for sports pitch construction was subject to frequent change and delay resulting from slippage in the programme for the new school buildings and follow-on contracts for the demolition of the existing school buildings.
This required a flexible approach from us and our sub-contractors to meet the changing requirements of the overall contract programme. We worked to ensure that we fulfilled our contract with maximum effectiveness.
Download Case Study
Click the link below to download the pdf